Details of Right of Way Available/ Not Available
| District |
Length (Km) |
Available Land as per Joint Memorandum |
Available Encumbrance free Land as on 30.11.2025 |
Land yet to be handed over to the Concessionaire by the Authority/Encumbrance/Hindrance/Not Available for Construction as on 30.11.2025 |
| LHS |
RHS |
LHS |
RHS |
LHS |
RHS |
| Total Land in Solapur District (Km) |
34.26 |
27.460 |
27.460 |
31.79 |
31.785 |
2.47 |
2.475 |
| Total Land in Kalburgi District (Km) |
2.14 |
1.740 |
1.740 |
0.53 |
0.53 |
1.610 |
1.610 |
| Total Land (Km) |
36.4 |
29.200 |
29.200 |
32.32 |
32.32 |
4.08 |
4.09 |