Details of Right of Way Available/ Not Available
| District |
Length (Km) |
Available Land as per Joint Memorandum |
Available Encumbrance free Land as on 30.09.2025 |
Land yet to be handed over to the Concessionaire by the Authority/Encumbrance/Hindrance/Not Available for Construction as on 30.09.2025 |
| LHS |
RHS |
LHS |
RHS |
LHS |
RHS |
| Total Land in Solapur District (Km) |
34.26 |
27.460 |
27.460 |
32.33 |
32.37 |
1.93 |
1.89 |
| Total Land in Kalburgi District (Km) |
2.14 |
1.740 |
1.740 |
1.85 |
1.85 |
0.290 |
0.290 |
| Total Land (Km) |
36.4 |
29.200 |
29.200 |
34.18 |
34.22 |
2.22 |
2.18 |